Traffic Control Plans
Need a Plan to Pull Your Permit?
Need a plan to pull your permit? We've got you covered. National Barricade & Sign now offers professional, MUTCD-compliant Traffic Control Plan design — delivered fast, by an ATSSA-certified designer with real field experience.
2-3 DAYS
standard turnaround4 states
WA · OR · ID · CA
See What You're Getting
This is an actual Traffic Control Plan prepared by our designer for a City of Spokane Valley project on Sprague Ave. Full lane detail, taper measurements, sign placement, barricade locations, legend — everything a permit office needs to approve your project.
Full Detail — Not a Template
Taper distances, lane widths, sign placement, barricade types, flagger positions — all drawn to your specific project and location.
Permit-Ready Format
Delivered as a PDF formatted to city and county submission standards. Stamped engineering plans available on request for projects that require them.
MUTCD & State-Compliant
All plans follow MUTCD guidelines and applicable state standards — WSDOT, ODOT, Idaho ITD, and Caltrans depending on your project location.
What Type of Project Do You Have?
Need a plan to pull your permit? We've got you covered. National Barricade & Sign now offers professional, MUTCD-compliant Traffic Control Plan design — delivered fast, by an ATSSA-certified designer with real field experience.
Highway & DOT Projects
State and federal highway work requires plans built to WSDOT, ODOT, or Caltrans standards. We know the formats and what reviewers look for.Local Street & Municipal
City and county projects often require a plan before a permit is issued. We handle the design so your crew can focus on the job.Utility & Emergency Work
Emergency excavations and utility repairs don't wait. Rush TCP turnaround is available when your project is on the clock.Events & Temporary Closures
Races, parades, festivals, farmers markets — any temporary closure that needs an approved plan before the permit office will sign off.how it works
Tell Us About Your Project
Call us or fill out the form. Share the location, project type, and your permit deadline.We Quote & Confirm
We review the scope and get back to you with a quote — usually within one business day.Plan Is Designed
Our ATSSA-certified designer creates your MUTCD-compliant plan. Standard turnaround is 2–3 business days.Submit & Get to Work
You get a permit-ready PDF. Need signs or barricades too? We've got those in stock and ready to ship.Four States. One Source.
Most local TCP designers work in one state. We cover Washington, Oregon, Idaho, and California — compliant with each state's DOT standards so your plan is accepted wherever your project is.
Not sure which standard applies to your project? Just call us and describe the job. We'll figure out the right format together.
WA
WashingtonWSDOT
OR
oregonODOT
ID
idahoIdaho ITD
CA
californiacaltrans
65+ Years on the Road
We're not a generic plan shop. We've been supplying signs, renting equipment, and watching how Traffic Control works in the real world since 1957. Our plans reflect that experience.
Plans That Match What's in the Field
We specify real products that are actually available. No generic placeholders that leave your crew guessing on install day.
We Know What Permit Offices Need
We deal with the same municipalities your projects run through. We know the formats, the details, and what reviewers push back on.
Plan + Signs + Equipment. One Call
Get the TCP, order your MUTCD signs, and rent your barricades all in one conversation. No chasing three different vendors.
65+
Years in BusinessServing the Pacific Northwest since 1957
4
States CoveredWA, OR, ID & CA — all DOT standards
2-3
Day Standard TurnaroundRush available for urgent projects
Request Your Traffic Control Plan
Fill out the form and we'll get back to you within one business day with a quote. The more detail you can share, the faster we can turn it around.
